... | @@ -5,7 +5,7 @@ timing system, which is under active development. It demonstrates |
... | @@ -5,7 +5,7 @@ timing system, which is under active development. It demonstrates |
|
real-time coordination of two front-end equipment controllers. The
|
|
real-time coordination of two front-end equipment controllers. The
|
|
product consists of a data master (Linux PC) which coordinates events, a
|
|
product consists of a data master (Linux PC) which coordinates events, a
|
|
timing master which synchronizes clocks (White Rabbit switch), and two
|
|
timing master which synchronizes clocks (White Rabbit switch), and two
|
|
front-end equipment controllers (either SPECv4 or
|
|
front-end equipment controllers (either SPECv4, Exploder, VETAR or
|
|
SCUv2).
|
|
SCUv2).
|
|
|
|
|
|
![](/uploads/3d53f148d6c986cce57a1012bca73533/timing-diagram.png)
|
|
![](/uploads/3d53f148d6c986cce57a1012bca73533/timing-diagram.png)
|
... | @@ -35,7 +35,7 @@ To use the GSI Timing Starter Kit you will need: |
... | @@ -35,7 +35,7 @@ To use the GSI Timing Starter Kit you will need: |
|
|
|
|
|
- 1x Linux PC with gcc to serve as Data Master (DM)
|
|
- 1x Linux PC with gcc to serve as Data Master (DM)
|
|
- 1x White Rabbit v3 switch
|
|
- 1x White Rabbit v3 switch
|
|
- 2x Supported FECs (either SCUv2, Exploder, Vetar or SPECv4)
|
|
- 2x Supported FECs (either SPECv4, Exploder, VETAR or SCUv2).
|
|
- SFPs and cables to connect FECs and DM to switch
|
|
- SFPs and cables to connect FECs and DM to switch
|
|
- (Optional) JTAG cables suitable for flashing chosen FECs
|
|
- (Optional) JTAG cables suitable for flashing chosen FECs
|
|
- (Optional) Linux host system for SPECv4 cards
|
|
- (Optional) Linux host system for SPECv4 cards
|
... | | ... | |