... | ... | @@ -10,7 +10,7 @@ BE-BI group (equivalent to what the VFC-HD is for the back-end |
|
|
applications). Its intended use ranges from fast data acquisition
|
|
|
systems to slow control installed close to the beamlines, in a
|
|
|
radioactive environment exposed to Total Ionizing Doses (TID) of up to
|
|
|
700 Gy.
|
|
|
750 Gy.
|
|
|
|
|
|
The GEFE takes advantage of the Giga Bit Transceiver (GBT)/Versatile
|
|
|
Link developed by the CERN PH-ESE group. This provides a rad-hard,
|
... | ... | @@ -46,13 +46,13 @@ requirement. |
|
|
|
|
|
## Main features
|
|
|
|
|
|
- Rad-hard FPGA (Microsemi ProAsic3, A3PE3000-FGG896) (TID up to 750
|
|
|
Gy)
|
|
|
- Rad-tolerant FPGA (Microsemi ProAsic3, A3PE3000-FGG896) (TID up to
|
|
|
750 Gy)
|
|
|
- Features different components of the GBT-Versatile Link ecosystem
|
|
|
from CERN PH-ESE
|
|
|
- VTRx
|
|
|
- GBTx
|
|
|
- SCA ready (SCA ASIC may be mounted on an FMC)
|
|
|
- GBT-SCA ready (GBT-SCA ASIC may be mounted on an FMC)
|
|
|
- FEASTMP
|
|
|
- Optical & Electrical serial links:
|
|
|
- One high-speed bidirectional optical link (Versatile Link) (4.8
|
... | ... | @@ -154,26 +154,38 @@ requirement. |
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>01-02-2016</td>
|
|
|
<td>Order sent to CERN TS-DEM for fabrication of 2 pre-production GEFE v2 prototypes.</td>
|
|
|
<td>Order sent to CERN TS-DEM for fabrication of 2 GEFE v2 prototypes.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>01-02-2016</td>
|
|
|
<td>Order sent to CERN TS-DEM for fabrication of 35 pre-production GEFE v2. (to be fabricated after GEFE v2 prototype testing).</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>12-08-2016</td>
|
|
|
<td>Fabrication of the 2 GEFE v2 prototypes finished.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>03-12-2015</td>
|
|
|
<td>GEFE v2 prototypes succesfully validated.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>12-08-2016</td>
|
|
|
<td>Qualification in radiation of the GEFE v2 in CHARM.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>18-04-2016</td>
|
|
|
<td>Delayed assembly of the 35 GEFE v2 until end of May due to components availability issue.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<tr class="odd">
|
|
|
<td>09-08-2016</td>
|
|
|
<td>Fabrication of the pre-production batch of 35 GEFE v2 finished.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<tr class="even">
|
|
|
<td>12-08-2016</td>
|
|
|
<td>Start distribution of the 35 pre-production GEFE v2.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>05-12-2014</td>
|
|
|
<tr class="odd">
|
|
|
<td>08-02-2017</td>
|
|
|
<td>First ideas about a new modular version of GEFE (GBT/Versatile Link ecosystem components on mezzanine).</td>
|
|
|
</tr>
|
|
|
</tbody>
|
... | ... | |