... | ... | @@ -87,22 +87,20 @@ requirement. |
|
|
### GEFE Community
|
|
|
|
|
|
- CERN BE-BI-QP:
|
|
|
- New Multi-Orbit POsition System SPS (MOPOS SPS): Requested 300
|
|
|
pieces
|
|
|
- Advanced Wakefield Experiment BPM (AWAKE BPM): Requested 30
|
|
|
pieces
|
|
|
- New Multi-Orbit POsition System SPS (MOPOS SPS): Requested 350
|
|
|
GEFE v2 (Delivered 3 GEFE v1 & 6 GEFE v2 for testing)
|
|
|
- CERN BE-BI-PM:
|
|
|
- Motor Controller Optical Interface (MCOI): Requested 25 pieces
|
|
|
- Motor Controller Optical Interface (MCOI): Delivered 25 GEFE v2
|
|
|
- CERN BE-BI-BL:
|
|
|
- Beam Wire Scanners: Interested
|
|
|
- Beam Gas Ionization (BGI) Monitor: Interested
|
|
|
- Beam Wire Scanners: Delivered 1 GEFE v1 & 1 GEFE v2
|
|
|
- Beam Gas Ionization (BGI) Monitor: Delivered 2 GEFE v2
|
|
|
- CERN BE-CO:
|
|
|
- CLIC Acquisition and Control Module (CLIC-ACM): Interested
|
|
|
- New Rad-tol fieldbus devkit: Interested
|
|
|
- New Rad-tol fieldbus devkit: Requested 1 GEFE v2
|
|
|
- CERN TE-EPC:
|
|
|
- Function Generator Controller Lite (FGClite): Interested
|
|
|
- Function Generator Controller Lite (FGClite): Delivered 1 GEFE
|
|
|
v2
|
|
|
- CERN EN-STI:
|
|
|
- CHARM test board: Interested
|
|
|
- CHARM test board: Delivered 2 GEFE v2
|
|
|
|
|
|
### Contact
|
|
|
|
... | ... | @@ -166,10 +164,22 @@ requirement. |
|
|
<td>18-04-2016</td>
|
|
|
<td>Delayed assembly of the 35 GEFE v2 until end of May due to components availability issue.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>09-08-2016</td>
|
|
|
<td>Fabrication of the pre-production batch of 35 GEFE v2 finished.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>12-08-2016</td>
|
|
|
<td>Start distribution of the 35 pre-production GEFE v2.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>05-12-2014</td>
|
|
|
<td>First ideas about a new modular version of GEFE (GBT/Versatile Link ecosystem components on mezzanine).</td>
|
|
|
</tr>
|
|
|
</tbody>
|
|
|
</table>
|
|
|
|
|
|
-----
|
|
|
|
|
|
Manoel Barros Marin - 01 December 2015
|
|
|
Manoel Barros Marin - 15 February 2017
|
|
|
|