... | @@ -310,10 +310,18 @@ The timebase from a local TCXO on FMC card needs calibration. The 4ppm accuracy |
... | @@ -310,10 +310,18 @@ The timebase from a local TCXO on FMC card needs calibration. The 4ppm accuracy |
|
<td>10-09-2012</td>
|
|
<td>10-09-2012</td>
|
|
<td>CERN entered the modules in the stock for later use in LHC and other accelerators.</td>
|
|
<td>CERN entered the modules in the stock for later use in LHC and other accelerators.</td>
|
|
</tr>
|
|
</tr>
|
|
|
|
<tr class="odd">
|
|
|
|
<td>27-09-2012</td>
|
|
|
|
<td>Order placed with INCAA for additional 30 cards (V4-0).</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="even">
|
|
|
|
<td>08-01-2013</td>
|
|
|
|
<td>70 cards being shipped to CERN.</td>
|
|
|
|
</tr>
|
|
</tbody>
|
|
</tbody>
|
|
</table>
|
|
</table>
|
|
|
|
|
|
-----
|
|
-----
|
|
|
|
|
|
Erik van der Bij - 10 September 2012
|
|
Erik van der Bij - 8 January 2013
|
|
|
|
|