... | @@ -11,6 +11,7 @@ repetition |
... | @@ -11,6 +11,7 @@ repetition |
|
rates.
|
|
rates.
|
|
|
|
|
|
[![](/uploads/5501bc2d6ca25f5aed0b6f7054448e97/EDA-03339-V3-top_thumb.jpg)](/uploads/c2b4aca4eb2bc579d8af2e4a10e2d298/EDA-03339-V3-top.jpg)
|
|
[![](/uploads/5501bc2d6ca25f5aed0b6f7054448e97/EDA-03339-V3-top_thumb.jpg)](/uploads/c2b4aca4eb2bc579d8af2e4a10e2d298/EDA-03339-V3-top.jpg)
|
|
|
|
|
|
[![](/uploads/d67cf98a183dbd845abffc73b907c7f8/EDA-03339-V3-front_thumb.jpg)](/uploads/71088afdd6d29138e1703d4c343e960b/EDA-03339-V3-front.jpg)
|
|
[![](/uploads/d67cf98a183dbd845abffc73b907c7f8/EDA-03339-V3-front_thumb.jpg)](/uploads/71088afdd6d29138e1703d4c343e960b/EDA-03339-V3-front.jpg)
|
|
|
|
|
|
-----
|
|
-----
|
... | @@ -81,8 +82,7 @@ rates. |
... | @@ -81,8 +82,7 @@ rates. |
|
|12-08-2016|Some small [issues](https://www.ohwr.org/project/fmc-del-1ns-2cha/versions/135) found but the board is functional.|
|
|
|12-08-2016|Some small [issues](https://www.ohwr.org/project/fmc-del-1ns-2cha/versions/135) found but the board is functional.|
|
|
|03-11-2016|First two prototype boards deployed (on a SVEC) in LHC for control of Schottky Monitor fast gates.|
|
|
|03-11-2016|First two prototype boards deployed (on a SVEC) in LHC for control of Schottky Monitor fast gates.|
|
|
|19-01-2017|Module presented at the BI Technical Board ([slides](https://indico.cern.ch/event/587494/contributions/2367714/1394441)).|
|
|
|19-01-2017|Module presented at the BI Technical Board ([slides](https://indico.cern.ch/event/587494/contributions/2367714/1394441)).|
|
|
|01-05-2017|Decision to change from surface mount SMA connectors to through hole due to reliability issues.
|
|
|01-05-2017|Decision to change from surface mount SMA connectors to through hole due to reliability issues. [Amphenol 901-10138](http://www.amphenolrf.com/901-10138.html) selected as a replacement.|
|
|
[Amphenol 901-10138](http://www.amphenolrf.com/901-10138.html) selected as a replacement.|
|
|
|
|
|22-05-2017|Version 3 design changes finished.|
|
|
|22-05-2017|Version 3 design changes finished.|
|
|
|14-09-2017|12 assembled PCBs received and tested.|
|
|
|14-09-2017|12 assembled PCBs received and tested.|
|
|
|
|
|
... | | ... | |