... | ... | @@ -81,7 +81,7 @@ rates. |
|
|
|10-08-2016|First prototype boards under test.|
|
|
|
|12-08-2016|Some small [issues](https://www.ohwr.org/project/fmc-del-1ns-2cha/versions/135) found but the board is functional.|
|
|
|
|03-11-2016|First two prototype boards deployed (on a SVEC) in LHC for control of Schottky Monitor fast gates.|
|
|
|
|19-01-2017|Module presented at the BI Technical Board ([slides](https://indico.cern.ch/event/587494/contributions/2367714/1394441)).|
|
|
|
|19-01-2017|Module presented at the BI Technical Board ([slides](https://indico.cern.ch/event/587494/contributions/2367714/attachments/1394441/2126486/presentation_2017_01_19.pptx)).|
|
|
|
|01-05-2017|Decision to change from surface mount SMA connectors to through hole due to reliability issues. [Amphenol 901-10138](http://www.amphenolrf.com/901-10138.html) selected as a replacement.|
|
|
|
|22-05-2017|Version 3 design changes finished.|
|
|
|
|14-09-2017|12 assembled PCBs received and tested.|
|
... | ... | @@ -89,6 +89,6 @@ rates. |
|
|
|
|
|
-----
|
|
|
|
|
|
Michael Betz, Tom Levens - 09 February 2016
|
|
|
Michael Betz, Tom Levens, Jan Pospisil - 09 February 2016
|
|
|
|
|
|
|