... | @@ -29,8 +29,8 @@ range. |
... | @@ -29,8 +29,8 @@ range. |
|
|max. gain error|+/- 1 % (30-70°C);+/- 2 % (0-70°C)|
|
|
|max. gain error|+/- 1 % (30-70°C);+/- 2 % (0-70°C)|
|
|
|max. offset error|+/- 0.4 % (30-70°C);+/- 0.5 % (0-70°C)|
|
|
|max. offset error|+/- 0.4 % (30-70°C);+/- 0.5 % (0-70°C)|
|
|
|FMC to carrier interface|FMC high pin count connector (HPC only used if external clock is selected)|
|
|
|FMC to carrier interface|FMC high pin count connector (HPC only used if external clock is selected)|
|
|
|Clock source|Internal: from programmable on-board oscillator. |
|
|
|Clock source|Internal: from programmable on-board oscillator (default).<br/>External: from dedicated FMC connector pins (HPC) when changing two capacitors.|
|
|
|| External: from dedicated FMC connector pins (HPC) when changing two capacitors.|
|
|
| FMC Vadj | 2.5V only |
|
|
|
|
|
|
|
|
|
|
**2017 measurements on -V5**
|
|
**2017 measurements on -V5**
|
... | @@ -143,6 +143,7 @@ Other information: |
... | @@ -143,6 +143,7 @@ Other information: |
|
|09-10-2017|[Detailed performance measurements made.](https://www.ohwr.org/documents/712)|
|
|
|09-10-2017|[Detailed performance measurements made.](https://www.ohwr.org/documents/712)|
|
|
|21-10-2019| [FMC-ADC-100M Noise Measurements](https://ohwr.org/project/fmc-adc-100m14b4cha-hw/wikis/l1_alternative_measurements) made to decide on alternative for obsolete L1 inductor. |
|
|
|21-10-2019| [FMC-ADC-100M Noise Measurements](https://ohwr.org/project/fmc-adc-100m14b4cha-hw/wikis/l1_alternative_measurements) made to decide on alternative for obsolete L1 inductor. |
|
|
|24-10-2019|Power supply for -8V redesigned because of obsolescence of inductor. Many other minor [issues handled in V6-0.](https://ohwr.org/project/fmc-adc-100m14b4cha-hw/milestones/1) |
|
|
|24-10-2019|Power supply for -8V redesigned because of obsolescence of inductor. Many other minor [issues handled in V6-0.](https://ohwr.org/project/fmc-adc-100m14b4cha-hw/milestones/1) |
|
|
|
|
|04-03-2020| 200 of these V6-0 cards will be built for CERN. |
|
|
|
|
|
|
[Complete status](complete-status)
|
|
[Complete status](complete-status)
|
|
|
|
|
... | @@ -150,6 +151,6 @@ Other information: |
... | @@ -150,6 +151,6 @@ Other information: |
|
|
|
|
|
-----
|
|
-----
|
|
|
|
|
|
Maciej Firmiarz, Matthieu Cattin, Erik van der Bij - 12 November 2019
|
|
Maciej Firmiarz, Matthieu Cattin, Erik van der Bij - 4 March 2020
|
|
|
|
|
|
|
|
|