... | ... | @@ -2,287 +2,85 @@ |
|
|
|
|
|
## Status
|
|
|
|
|
|
<table>
|
|
|
<tbody>
|
|
|
<tr class="odd">
|
|
|
<td><strong>Date</strong></td>
|
|
|
<td><b> Event </b></td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>01-10-2009</td>
|
|
|
<td>Start working on project</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>25-10-2009</td>
|
|
|
<td>Functional specification written.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>23-11-2009</td>
|
|
|
<td>Selection of components, waiting for schematic symbols.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>02-12-2009</td>
|
|
|
<td>Work on the FmcAdc100M14b4ch_a is suspended, because estimated performance wasn't reached.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>18-12-2009</td>
|
|
|
<td>Specification and schematic of new version has been added.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>22-01-2010</td>
|
|
|
<td>FmcAdc100M14b4cha upgrade. Design revised and modified, better parameters expected.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>10-02-2010</td>
|
|
|
<td>New design made with 3 input ranges and programmable offset.<br />
|
|
|
Need to finalise local clock circuit before PCB layout can start.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>24-02-2010</td>
|
|
|
<td>Draft PCB layout done. Design document being written. Design review planned for 2 March.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>02-03-2010</td>
|
|
|
<td>Design review of schematics done. [fmc-adc-100m14b4cha-hw:V1Review](https://www.ohwr.org/project/fmc-adc-100m14b4cha-hw/wikis)</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>04-03-2010</td>
|
|
|
<td>Improvements made, responding to design review. [fmc-adc-100m14b4cha-hw:V1ReviewImprov](https://www.ohwr.org/project/fmc-adc-100m14b4cha-hw/wikis)</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>19-03-2010</td>
|
|
|
<td>PCB review planned for 24 March 2010.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>24-03-2010</td>
|
|
|
<td>Design review of PCB layout done. [fmc-adc-100m14b4cha-hw:V1LayoutReview](https://www.ohwr.org/project/fmc-adc-100m14b4cha-hw/wikis)</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>25-03-2010</td>
|
|
|
<td>Small changes involved to the schematic (to make routing easier),<br />
|
|
|
PCB partially updated.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>29-03-2010</td>
|
|
|
<td>PCB updated. Waiting for Design Office's review.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>06-04-2010</td>
|
|
|
<td>12 PCBs ordered. 3 will be mounted for prototyping.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>12-04-2010</td>
|
|
|
<td>For availability reasons two resistor values need to be modified (120<del><span style="text-align:right;">121, 510</span></del>>511). See issues.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>06-05-2010</td>
|
|
|
<td>3 cards assembled, SMC connectors ordered but not yet available.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>28-05-2010</td>
|
|
|
<td>SMC connectors given to workshop. Boards look really nice.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>09-06-2010</td>
|
|
|
<td>3 assembled boards received.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>12-07-2010</td>
|
|
|
<td>One board plugged in on Xilinx development kit and powered. Debugging start.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>13-07-2010</td>
|
|
|
<td>Two channels working! Limited by Xilinx development kit clock connections.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>30-07-2010</td>
|
|
|
<td>Current consumption has been measured, document is now available on the wiki.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>30-07-2010</td>
|
|
|
<td>Changes for the second version of the PCB documented, mainly to solve thermal problems with regulators.<br />
|
|
|
Required change of DC/DC converter and inductor.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>30-07-2010</td>
|
|
|
<td>ENOB & SNR measured: >11 bits in all ranges.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>03-08-2010</td>
|
|
|
<td>First harmonic distortion measurements made. Needs further investigation as with -60dB is higher than expected.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>03-09-2010</td>
|
|
|
<td>The distortion source has been found.<br />
|
|
|
For further information go to [Investigating the distortion source...](https://www.ohwr.org/project/fmc-adc-100m14b4cha-hw/wikis)</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>03-09-2010</td>
|
|
|
<td><a href="https://www.ohwr.org/project/fmc-adc-100m14b4cha-hw/wikis">Thermal stability measurements</a> made.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>03-09-2010</td>
|
|
|
<td>Frequency response of the anti-aliasing filter will be verified and possibly corrected.<br />
|
|
|
Needs development of software that shows frequency response.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>07-09-2010</td>
|
|
|
<td>Both I2C buses are working. Accessing memory, setting the sampling frequency and<br />
|
|
|
making temperature measurements are now possible.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>08-09-2010</td>
|
|
|
<td>Issue with linearity in the 30-90 kHz region caused by offset compensation circuit being investigated.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>20-09-2010</td>
|
|
|
<td>The schematic has been updated. All the differences for the second version are given here :[PDF](https://www.ohwr.org/project/fmc-adc-100m14b4cha/uploads/708190067665268ac6ef5356ea116860/FmcAdc100m14b4cha_v1_changes.pdf)</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>29-09-2010</td>
|
|
|
<td>Updates to PCB made (EDA-02063-V2). Ten boards ordered. Designer left CERN.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>22-10-2010</td>
|
|
|
<td>Found inconsistencies in BOM. Requires modifications to schematics and production files.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>08-12-2010</td>
|
|
|
<td>Production of ten boards of V2 will arrive before <del>17 December</del>. Update 16-12-2010: will become 7 January.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>07-01-2011</td>
|
|
|
<td>Ten V2 boards arrived.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>23-02-2011</td>
|
|
|
<td>First board powered up on a SPEC carrier, no smoke!</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>03-03-2011</td>
|
|
|
<td>Trial of wave soldering of LEMO connector instead of SMC looks OK.<br />
|
|
|
PCB redesign needed if want to use wave soldering.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>08-03-2011</td>
|
|
|
<td>Basic HDL code written (single shot, no time stamps). Needs testing.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>28-03-2011</td>
|
|
|
<td>Basic HDL code tested. We're able to DMA raw adc data from DDR3 memory to the host and gnuplot them.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>21-06-2011</td>
|
|
|
<td>Made schematics and layout modifications for V3 (see [[fmc-adc-100m14b4cha-hw:V3ChangeLog</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>22-06-2011</td>
|
|
|
<td>Project sent to DEM for front panel modification and production file generation. Ready on 24-06-2011.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>27-06-2011</td>
|
|
|
<td>V3 ready for review.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>04-07-2011</td>
|
|
|
<td>V3 reviewed. [[fmc-adc-100m14b4cha-hw:V3Review</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>01-08-2011</td>
|
|
|
<td>Price Enquiry sent out for first Open Hardware production.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>12-08-2011</td>
|
|
|
<td>Firmware being finalised. Made re-usable for use in the fmc-adc-100k16b8cha":https://www.ohwr.org/project/fmc-adc-100k16b8cha, a slower ADC mezzanine.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>18-08-2011</td>
|
|
|
<td>Design of a [tester board](https://www.ohwr.org/project/usb-relay-box1/wikis).</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>30-08-2011</td>
|
|
|
<td>Production test software being written.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>12-09-2011</td>
|
|
|
<td>Price Enquiry finished. Received replies from several companies. Order for 40 cards being made.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>15-09-2011</td>
|
|
|
<td>V4 design made. Corrected some textual problems and one BOM item order number.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>20-09-2011</td>
|
|
|
<td>Order for 40 cards placed with INCAA Computers (V5). Delivery in January 2012.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>10-10-2011</td>
|
|
|
<td>Useful feedback from INCAA Computers made us improve the design as V5.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>02-12-2011</td>
|
|
|
<td>Firmware getting stable. Demo oscilloscope program in Python written.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>20-12-2011</td>
|
|
|
<td>Measured bandwidth is 30 MHz. 40 MHz bandwidth is possible by changing 2 capacitors per channel.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>10-01-2012</td>
|
|
|
<td>Expect delivery of 40 cards <del>in first week of March</del> end March (update 7-3-2012).</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>04-04-2012</td>
|
|
|
<td>First production received: 40 V5 cards produced by INCAA Computers.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>05-02-2013</td>
|
|
|
<td>Firmware development on-going. In parallel a driver is being written. Expect a release in April 2013</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>12-03-2013</td>
|
|
|
<td><a href="https://www.ohwr.org/project/fmc-adc-100m14b4cha-gw/wikis">Release 1.0</a> of the fmc-adc gateware for SPEC is available.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>28-03-2013</td>
|
|
|
<td><a href="https://www.ohwr.org/project/fmc-adc-100m14b4cha-gw/wikis">Release 1.1</a> of the fmc-adc gateware for SPEC is available.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>19-07-2013</td>
|
|
|
<td>Firmware ported to work on the [SVEC VME carrier](https://www.ohwr.org/project/svec/wiki).</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>29-07-2013</td>
|
|
|
<td><a href="https://www.ohwr.org/project/fmc-adc-100m14b4cha-gw/wikis">Release 2.0</a> of the fmc-adc gateware for SPEC is available.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>29-07-2013</td>
|
|
|
<td><a href="https://www.ohwr.org/project/fmc-adc-100m14b4cha-gw/wikis">Release 1.0</a> of the fmc-adc gateware for SVEC is available.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>17-01-2014</td>
|
|
|
<td>Release 3.0 of the fmc-adc gateware for <a href="https://www.ohwr.org/project/fmc-adc-100m14b4cha-gw/wikis">SPEC</a> and <a href="https://www.ohwr.org/project/fmc-adc-100m14b4cha-gw/wikis">SVEC</a> is available.</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>24-03-2014</td>
|
|
|
<td>Cards deployed in CERN's accelerator complex. Start of development to deployement: 4.5 year.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>22-04-2014</td>
|
|
|
<td>CERN ordered 100 boards (V5-0) for delivery by 18/7/14 (20) and 19/9/14 (80).</td>
|
|
|
</tr>
|
|
|
<tr class="even">
|
|
|
<td>18-07-2014</td>
|
|
|
<td>Received 20 pre-series boards.</td>
|
|
|
</tr>
|
|
|
<tr class="odd">
|
|
|
<td>07-09-2015</td>
|
|
|
<td>Over 40 installed in CERN's accelerator complex.</td>
|
|
|
</tr>
|
|
|
</tbody>
|
|
|
</table>
|
|
|
|**Date**|**Event**|
|
|
|
|----|----|
|
|
|
|01-10-2009|Start working on project|
|
|
|
|25-10-2009|Functional specification written.|
|
|
|
|23-11-2009|Selection of components, waiting for schematic symbols.|
|
|
|
|02-12-2009|Work on the FmcAdc100M14b4ch_a is suspended, because estimated performance wasn't reached.|
|
|
|
|18-12-2009|Specification and schematic of new version has been added.|
|
|
|
|22-01-2010|FmcAdc100M14b4cha upgrade. Design revised and modified, better parameters expected.|
|
|
|
|10-02-2010|New design made with 3 input ranges and programmable offset.
|
|
|
Need to finalise local clock circuit before PCB layout can start.|
|
|
|
|24-02-2010|Draft PCB layout done. Design document being written. Design review planned for 2 March.|
|
|
|
|02-03-2010|Design review of schematics done. [fmc-adc-100m14b4cha-hw:V1Review](https://www.ohwr.org/project/fmc-adc-100m14b4cha-hw/wikis)|
|
|
|
|04-03-2010|Improvements made, responding to design review. [fmc-adc-100m14b4cha-hw:V1ReviewImprov](https://www.ohwr.org/project/fmc-adc-100m14b4cha-hw/wikis)|
|
|
|
|19-03-2010|PCB review planned for 24 March 2010.|
|
|
|
|24-03-2010|Design review of PCB layout done. [fmc-adc-100m14b4cha-hw:V1LayoutReview](https://www.ohwr.org/project/fmc-adc-100m14b4cha-hw/wikis)|
|
|
|
|25-03-2010|Small changes involved to the schematic (to make routing easier),
|
|
|
PCB partially updated.|
|
|
|
|29-03-2010|PCB updated. Waiting for Design Office's review.|
|
|
|
|06-04-2010|12 PCBs ordered. 3 will be mounted for prototyping.|
|
|
|
|12-04-2010|For availability reasons two resistor values need to be modified (120121, 510>511). See issues.|
|
|
|
|06-05-2010|3 cards assembled, SMC connectors ordered but not yet available.|
|
|
|
|28-05-2010|SMC connectors given to workshop. Boards look really nice.|
|
|
|
|09-06-2010|3 assembled boards received.|
|
|
|
|12-07-2010|One board plugged in on Xilinx development kit and powered. Debugging start.|
|
|
|
|13-07-2010|Two channels working! Limited by Xilinx development kit clock connections.|
|
|
|
|30-07-2010|Current consumption has been measured, document is now available on the wiki.|
|
|
|
|30-07-2010|Changes for the second version of the PCB documented, mainly to solve thermal problems with regulators.
|
|
|
Required change of DC/DC converter and inductor.|
|
|
|
|30-07-2010|ENOB & SNR measured: >11 bits in all ranges.|
|
|
|
|03-08-2010|First harmonic distortion measurements made. Needs further investigation as with -60dB is higher than expected.|
|
|
|
|03-09-2010|The distortion source has been found.
|
|
|
For further information go to [Investigating the distortion source...](https://www.ohwr.org/project/fmc-adc-100m14b4cha-hw/wikis)|
|
|
|
|03-09-2010|[Thermal stability measurements](https://www.ohwr.org/project/fmc-adc-100m14b4cha-hw/wikis) made.|
|
|
|
|03-09-2010|Frequency response of the anti-aliasing filter will be verified and possibly corrected.
|
|
|
Needs development of software that shows frequency response.|
|
|
|
|07-09-2010|Both I2C buses are working. Accessing memory, setting the sampling frequency and
|
|
|
making temperature measurements are now possible.|
|
|
|
|08-09-2010|Issue with linearity in the 30-90 kHz region caused by offset compensation circuit being investigated.|
|
|
|
|20-09-2010|The schematic has been updated. All the differences for the second version are given here :[PDF](https://www.ohwr.org/project/fmc-adc-100m14b4cha/uploads/708190067665268ac6ef5356ea116860/FmcAdc100m14b4cha_v1_changes.pdf)|
|
|
|
|29-09-2010|Updates to PCB made (EDA-02063-V2). Ten boards ordered. Designer left CERN.|
|
|
|
|22-10-2010|Found inconsistencies in BOM. Requires modifications to schematics and production files.|
|
|
|
|08-12-2010|Production of ten boards of V2 will arrive before 17 December. Update 16-12-2010: will become 7 January.|
|
|
|
|07-01-2011|Ten V2 boards arrived.|
|
|
|
|23-02-2011|First board powered up on a SPEC carrier, no smoke!|
|
|
|
|03-03-2011|Trial of wave soldering of LEMO connector instead of SMC looks OK.
|
|
|
PCB redesign needed if want to use wave soldering.|
|
|
|
|08-03-2011|Basic HDL code written (single shot, no time stamps). Needs testing.|
|
|
|
|28-03-2011|Basic HDL code tested. We're able to DMA raw adc data from DDR3 memory to the host and gnuplot them.|
|
|
|
|21-06-2011|Made schematics and layout modifications for V3 (see [[fmc-adc-100m14b4cha-hw:V3ChangeLog|
|
|
|
|22-06-2011|Project sent to DEM for front panel modification and production file generation. Ready on 24-06-2011.|
|
|
|
|27-06-2011|V3 ready for review.|
|
|
|
|04-07-2011|V3 reviewed. [[fmc-adc-100m14b4cha-hw:V3Review|
|
|
|
|01-08-2011|Price Enquiry sent out for first Open Hardware production.|
|
|
|
|12-08-2011|Firmware being finalised. Made re-usable for use in the fmc-adc-100k16b8cha":https://www.ohwr.org/project/fmc-adc-100k16b8cha, a slower ADC mezzanine.|
|
|
|
|18-08-2011|Design of a [tester board](https://www.ohwr.org/project/usb-relay-box1/wikis).|
|
|
|
|30-08-2011|Production test software being written.|
|
|
|
|12-09-2011|Price Enquiry finished. Received replies from several companies. Order for 40 cards being made.|
|
|
|
|15-09-2011|V4 design made. Corrected some textual problems and one BOM item order number.|
|
|
|
|20-09-2011|Order for 40 cards placed with INCAA Computers (V5). Delivery in January 2012.|
|
|
|
|10-10-2011|Useful feedback from INCAA Computers made us improve the design as V5.|
|
|
|
|02-12-2011|Firmware getting stable. Demo oscilloscope program in Python written.|
|
|
|
|20-12-2011|Measured bandwidth is 30 MHz. 40 MHz bandwidth is possible by changing 2 capacitors per channel.|
|
|
|
|10-01-2012|Expect delivery of 40 cards in first week of March end March (update 7-3-2012).|
|
|
|
|04-04-2012|First production received: 40 V5 cards produced by INCAA Computers.|
|
|
|
|05-02-2013|Firmware development on-going. In parallel a driver is being written. Expect a release in April 2013|
|
|
|
|12-03-2013|[Release 1.0](https://www.ohwr.org/project/fmc-adc-100m14b4cha-gw/wikis) of the fmc-adc gateware for SPEC is available.|
|
|
|
|28-03-2013|[Release 1.1](https://www.ohwr.org/project/fmc-adc-100m14b4cha-gw/wikis) of the fmc-adc gateware for SPEC is available.|
|
|
|
|19-07-2013|Firmware ported to work on the [SVEC VME carrier](https://www.ohwr.org/project/svec/wiki).|
|
|
|
|29-07-2013|[Release 2.0](https://www.ohwr.org/project/fmc-adc-100m14b4cha-gw/wikis) of the fmc-adc gateware for SPEC is available.|
|
|
|
|29-07-2013|[Release 1.0](https://www.ohwr.org/project/fmc-adc-100m14b4cha-gw/wikis) of the fmc-adc gateware for SVEC is available.|
|
|
|
|17-01-2014|Release 3.0 of the fmc-adc gateware for [SPEC](https://www.ohwr.org/project/fmc-adc-100m14b4cha-gw/wikis) and [SVEC](https://www.ohwr.org/project/fmc-adc-100m14b4cha-gw/wikis) is available.|
|
|
|
|24-03-2014|Cards deployed in CERN's accelerator complex. Start of development to deployement: 4.5 year.|
|
|
|
|22-04-2014|CERN ordered 100 boards (V5-0) for delivery by 18/7/14 (20) and 19/9/14 (80).|
|
|
|
|18-07-2014|Received 20 pre-series boards.|
|
|
|
|07-09-2015|Over 40 installed in CERN's accelerator complex.|
|
|
|
|
|
|
|
|
|
-----
|
|
|
|
|
|
Erik van der Bij - 21 July 2014
|
|
|
|
|
|
|