Skip to content
GitLab
Explore
Sign in
Projects
FMC ADC 100M 14b 4cha
Wiki
Complete status
Complete status
· Changes
Page history
| 07-09-2015 | Over 40 installed in CERN's accelerator complex. |
authored
Sep 07, 2015
by
Erik van der Bij
Show whitespace changes
Inline
Side-by-side
Complete-status.md
View page @
78a06cd3
...
@@ -275,6 +275,10 @@ PCB redesign needed if want to use wave soldering.</td>
...
@@ -275,6 +275,10 @@ PCB redesign needed if want to use wave soldering.</td>
<td>
18-07-2014
</td>
<td>
18-07-2014
</td>
<td>
Received 20 pre-series boards.
</td>
<td>
Received 20 pre-series boards.
</td>
</tr>
</tr>
<tr
class=
"odd"
>
<td>
07-09-2015
</td>
<td>
Over 40 installed in CERN's accelerator complex.
</td>
</tr>
</tbody>
</tbody>
</table>
</table>
...
...