... | @@ -9,18 +9,29 @@ This project contains the information about the hardware for the |
... | @@ -9,18 +9,29 @@ This project contains the information about the hardware for the |
|
[fmc-adc-100m14b4cha](https://www.ohwr.org/project/fmc-adc-100m14b4cha)
|
|
[fmc-adc-100m14b4cha](https://www.ohwr.org/project/fmc-adc-100m14b4cha)
|
|
project.
|
|
project.
|
|
|
|
|
|
Put some pictures here.
|
|
![](/project/fmc-adc-100m14b4cha/uploads/d48f899d27512044661f3f60d68afbf7/fmc-adc_v3_front_small.jpg)
|
|
\!\!
|
|
![](/project/fmc-adc-100m14b4cha/uploads/a2dfe49c172c38146036b235e71b4c02/fmc-adc_v3_top_small.jpg)
|
|
\[.\]
|
|
\[fmc-adc board version 3 front and top view.\]
|
|
|
|
|
|
-----
|
|
-----
|
|
|
|
|
|
## Versions
|
|
## Versions
|
|
|
|
|
|
|
|
- **Official production documentation (schematics, PCB, etc.):**
|
|
|
|
[EDMS: EDA-02063](https://edms.cern.ch/nav/EDA-02063)
|
|
|
|
- Currently supported version: FMCADC100M14b4cha V5 -
|
|
|
|
[EDA-02063-V5-0](https://edms.cern.ch/nav/EDA-02063-V5-0)
|
|
|
|
|
|
-----
|
|
-----
|
|
|
|
|
|
## Documentation
|
|
## Documentation
|
|
|
|
|
|
|
|
- [Design notes](DesignNotes)
|
|
|
|
|
|
|
|
- [Power consumption](PowerConsumption)
|
|
|
|
|
|
|
|
-
|
|
|
|
|
|
-----
|
|
-----
|
|
|
|
|
|
## Support
|
|
## Support
|
... | @@ -45,7 +56,7 @@ asking for support on the mailing list. |
... | @@ -45,7 +56,7 @@ asking for support on the mailing list. |
|
|
|
|
|
### People involved
|
|
### People involved
|
|
|
|
|
|
- "Maciej Firmiaz" - ex-CERN
|
|
- "Maciej Fimiarz" - ex-CERN
|
|
- [Erik Van der Bij](mailto:Erik.van.der.Bij@cern.ch) - CERN
|
|
- [Erik Van der Bij](mailto:Erik.van.der.Bij@cern.ch) - CERN
|
|
|
|
|
|
-----
|
|
-----
|
... | @@ -58,6 +69,82 @@ asking for support on the mailing list. |
... | @@ -58,6 +69,82 @@ asking for support on the mailing list. |
|
<td><strong>Date</strong></td>
|
|
<td><strong>Date</strong></td>
|
|
<td><b> Event </b></td>
|
|
<td><b> Event </b></td>
|
|
</tr>
|
|
</tr>
|
|
|
|
<tr class="even">
|
|
|
|
<td>22-01-2010</td>
|
|
|
|
<td>FmcAdc100M14b4cha upgrade. Design revised and modified, better parameters expected.</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="odd">
|
|
|
|
<td>10-02-2010</td>
|
|
|
|
<td>New design made with 3 input ranges and programmable offset.</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="even">
|
|
|
|
<td>04-03-2010</td>
|
|
|
|
<td>Improvements made, responding to design review. [Review02032010-improvements](Review02032010-improvements)</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="odd">
|
|
|
|
<td>24-03-2010</td>
|
|
|
|
<td>Design review of PCB layout done. [Review24032010](Review24032010)</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="even">
|
|
|
|
<td>09-06-2010</td>
|
|
|
|
<td>3 assembled boards received.</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="odd">
|
|
|
|
<td>12-07-2010</td>
|
|
|
|
<td>One board plugged in on Xilinx development kit and powered. Debugging start.</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="even">
|
|
|
|
<td>30-07-2010</td>
|
|
|
|
<td>ENOB & SNR measured: >11 bits in all ranges.</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="odd">
|
|
|
|
<td>08-09-2010</td>
|
|
|
|
<td>Issue with linearity in the 30-90 kHz region caused by offset compensation circuit being investigated.</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="even">
|
|
|
|
<td>29-09-2010</td>
|
|
|
|
<td>Updates to PCB made (EDA-02063-V2). Ten boards ordered. Designer left CERN.</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="odd">
|
|
|
|
<td>07-01-2011</td>
|
|
|
|
<td>Ten V2 boards arrived.</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="even">
|
|
|
|
<td>04-07-2011</td>
|
|
|
|
<td>V3 reviewed. <a href="ReviewV3">V3 review</a>. 3 prototypes will be built. [V3 changelog](Changelog-v3).</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="odd">
|
|
|
|
<td>01-08-2011</td>
|
|
|
|
<td>Price Enquiry sent out for first Open Hardware production.</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="even">
|
|
|
|
<td>15-09-2011</td>
|
|
|
|
<td>V4 design made. Corrected some textual problems and one BOM item order number.</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="odd">
|
|
|
|
<td>20-09-2011</td>
|
|
|
|
<td>Order for 40 cards placed with INCAA Computers (V5). Delivery in January 2012.</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="even">
|
|
|
|
<td>20-12-2011</td>
|
|
|
|
<td>Measured bandwidth is 30 MHz. 40 MHz bandwidth is possible by changing 2 capacitors per channel.</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="odd">
|
|
|
|
<td>04-04-2012</td>
|
|
|
|
<td>First production received: 40 V5 cards produced by INCAA Computers.</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="even">
|
|
|
|
<td>24-03-2014</td>
|
|
|
|
<td>Cards deployed in CERN's accelerator complex. Start of development to deployement: 4.5 year.</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="odd">
|
|
|
|
<td>22-04-2014</td>
|
|
|
|
<td>CERN ordered 100 boards (V5-0) for delivery by 18/7/14 (20) and 19/9/14 (80).</td>
|
|
|
|
</tr>
|
|
|
|
<tr class="even">
|
|
|
|
<td>18-07-2014</td>
|
|
|
|
<td>Received 20 pre-series boards.</td>
|
|
|
|
</tr>
|
|
</tbody>
|
|
</tbody>
|
|
</table>
|
|
</table>
|
|
|
|
|
... | | ... | |