# EMC tests of non-rad-tol DI/OT system
|
|
# EMC tests of non-rad-tol DI/OT system
|
|
|
|
|
|
Test setup:
|
|
## Levels of EMC environment as per standard 61000-4-4:
|
|
- Crate
|
|
* **level 1**: well protected environment (e.g. computer room)
|
|
- 2x Hartmann PSUs
|
|
* **level 2**: protected environment (e.g. control room of instustrial plants)
|
|
|
|
* **level 3**: (5kHz, 100kHz, 2kV to power lines, 1kV to signal ports): industrial environment, no surpression of bursts, poor separation of industrial circuits, poor separation of power and signal cables
|
|
|
|
* **level 4**: (4kV to powerlines, 2kV to signal lines): heavy industrial, power plants, rely rooms
|
|
|
|
|
|
|
|
*Possible test results*
|
|
|
|
* **A** - good performance
|
|
|
|
* **B** - some interuption that disapears after stopping test - automatic recovery
|
|
|
|
* **C** - temp loss of function but requires intervention (need to reset)
|
|
|
|
* **D** - not recoverable loss
|
|
|
|
|
|
|
|
## EMC tests campaign 15 Feb 2023
|
|
|
|
|
|
|
|
### Test setup
|
|
|
|
- 1x DI/OT Crate
|
|
- 1x Non-rad-tol System Board
|
|
- 1x Non-rad-tol System Board
|
|
|
|
- 2x Hartmann D575.00520 PSU
|
|
|
|
|
|
standard 61000-4-4:
|
|
### Performed tests
|
|
level 1: well protected environment (e.g. computer room)
|
|
|
|
level 2: protected environment (e.g. control room of instustrail plants)
|
|
|
|
level 3 (2kV, 5kHz or 100 kHz, for signal ports 1kV): industrial environment, no surpression of bursts, poor separation of industrial circuits, poor separation of power and signal cables
|
|
|
|
level 4 (4kV to power and 2kV to signal lines): heavy industrial, power plants, rely rooms
|
|
|
|
|
|
|
|
A - good performance
|
|
All timestamps in local time, tests performed according to the 61000-4-5 standard.
|
|
B- some interuption that disapears after stopping test - automatic recovery
|
|
|
|
C - temp loss of function but requires intervention (need to reset)
|
|
|
|
D - not recoverable loss
|
|
|
|
|
|
|
|
all timestamps in local time
|
|
1. Surge test on 230VAC power line (testing the PSUs) - PSU1
|
|
according to standard: 61000-4-5
|
|
|
|
1. Surge test on 230VAC power line (testing the Hartmann PSU) - PSU1
|
|
|
|
1. 500V every 10s into L and N, 20 surges, test start 10:57 - all good
|
|
1. 500V every 10s into L and N, 20 surges, test start 10:57 - all good
|
|
2. 2kV every 10s into L and N, 20 surges, test start 11:03 - all good
|
|
2. 2kV every 10s into L and N, 20 surges, test start 11:03 - all good
|
|
2. Surge test on 230VAC power line (testing the Hartmann PSU) - PSU2
|
|
2. Surge test on 230VAC power line (testing the Hartmann PSU) - PSU2
|
... | @@ -36,4 +41,8 @@ according to standard: 61000-4-5 |
... | @@ -36,4 +41,8 @@ according to standard: 61000-4-5 |
|
9. 1kV, , Ethernet unshielded cable - test start 12:01 (60s) - all good
|
|
9. 1kV, , Ethernet unshielded cable - test start 12:01 (60s) - all good
|
|
10. -1kV, , Ethernet unshielded cable - test start 12:03 (60s) - all good
|
|
10. -1kV, , Ethernet unshielded cable - test start 12:03 (60s) - all good
|
|
11. -2kV, , Ethernet unshielded cable - test start 12:05 (60s) - all good
|
|
11. -2kV, , Ethernet unshielded cable - test start 12:05 (60s) - all good
|
|
12. 2kV, , Ethernet unshielded cable - test start 12:06 (60s) - all good |
|
12. 2kV, , Ethernet unshielded cable - test start 12:06 (60s) - all good
|
|
\ No newline at end of file |
|
|
|
|
|
### Results
|
|
|
|
|
|
|
|
DI/OT crate setup passed all tests without any issues observed. |
|
|
|