# 10 Jan 2020:
|
|
|
--> Ask for **tentative-BOM** (for Schroff, CERN-stores) <br/>
|
|
|
--> Check that **provided material** for actions B1, B2 is ok <br/>
|
|
|
--> Check **progress** on Actions A1-9 <br/>
|
|
|
--> Ensure **rad issues** are taken into account
|
|
|
|
|
|
## New ACTIONS
|
|
|
|
|
|
- **ACTION A10:** Tentative **BOM** to be provided (for Schroff, CERN-stores)
|
|
|
----
|
|
|
- **ACTION B3:** CERN to check which **materials** should not be installed in the tunnel and to confirm that plastics: PLA/ ABS/ photopolymeric raisins are ok
|
|
|
|
|
|
|
|
|
## ACTIONS to be followed up
|
|
|
|
|
|
- **ACTION A2:** **Metal plate** under design; to be delivered next week
|
|
|
|
|
|
- **ACTION A4:** **Roof** design ongoing; **feet** added on the perforated bottom panel; cheap solution; 6 to 10 feet added to hold all the weight.
|
|
|
Note that the perforated panels are anyway customized (not off-the-shelf) for the cutouts at 160 and 220mm
|
|
|
|
|
|
- **ACTION A6:** Please have a look at the WR-switch **cable holder**
|
|
|
![cable-holder](uploads/fbfada9cf439fee71f6b2848408be58f/cable-holder.jpg)
|
|
|
|
|
|
- **ACTION A7:** Ongoing Autodesk model browser **descriptive names**
|
|
|
|
|
|
- **ACTION A8:** Waiting for Schroff input on **colors and 6HP RTM** front panels
|
|
|
|
|
|
- **ACTION A9:** **Anna** is back from holidays on Monday and will follow-up with Erik
|
|
|
|
|
|
|
|
|
## Next steps:
|
|
|
|
|
|
* Creotech corrects most of the the aforementioned issues
|
|
|
* CERN reviews 3D model
|
|
|
* In parallel Creotech purchases all the BOM; Anna and Erik will be in contact
|
|
|
* After the 3D approval, Creotech writes the technical doc
|
|
|
* Finally CERN reviews all the work-package output with the mechanical office
|
|
|
|
|
|
|
|
|
## ACTIONS completed:
|
|
|
- **ACTION A1:** Done; elements added
|
|
|
- **ACTION A3:** Done; butterfly screw added
|
|
|
- **ACTION A5:** Done; rails do have ESD protection (the metalic part is added as an extra); green rails for the 160mm power suppl; RTM rails available only in red
|
|
|
- **ACTION B1:** Done; AWG-10 for 600W (12V, 50A) -- 6mm2 cross section area of copper, 5.1mm outer diameter including insulation
|
|
|
- **ACTION B2:** Done; https://cernbox.cern.ch/index.php/s/0hkfPstk6pJq3lK
|
|
|
|
|
|
|
|
|
# 7 Jan 2020:
|
... | ... | @@ -12,14 +48,21 @@ |
|
|
- **ACTION A1:** What about the **addition of the elements shown below**, that are present in the off-the-shelf crates, on the front and the back?
|
|
|
![crate-rail-front](uploads/41932f0fe26e0d9da2b52949f2e1f7b7/crate-rail-front.png)
|
|
|
![crate-rail-back](uploads/764b5dc619d8c1d2a6d16a6e929052b8/crate-rail-back.png)
|
|
|
|
|
|
----> Done
|
|
|
|
|
|
- **ACTION A2:** Addition of a metal plate protection of **230V cables for the RTMs**; check if it would disturb the External Power Supply cassette
|
|
|
----> To be delivered next week
|
|
|
|
|
|
- **ACTION A3:** Replace GND connection screw with **butterfly** type
|
|
|
----> Done
|
|
|
|
|
|
- **ACTION A4:** Add to the crate design **optional roof and feet**; an example shown here:
|
|
|
|
|
|
![cryo-crate1](uploads/192b2d4938f2be8e0e6257033245e8b4/cryo-crate1.png) ![cryo-crate2](uploads/8eb44abee935fe744d328ab04421ca6d/cryo-crate2.png)
|
|
|
|
|
|
----> Feet added on the perforated bottom panel; cheap solution; 6 to 10 feet added to hold all the weight.
|
|
|
The perforated panels are customized for the cutouts at 160 and 220mm
|
|
|
|
|
|
|
|
|
- **ACTION A5:** **Rails** to confirm they have the ESD protection;
|
|
|
For power cards rails could be green, as in off-the-shelf crates;
|
... | ... | @@ -27,22 +70,29 @@ It seems there are only red rails for RTMs, to be confirmed; ideally they should |
|
|
|
|
|
![rails](uploads/b91ab6374189080f14444047f4332803/rails.jpg)
|
|
|
|
|
|
----> Done. rails do have ESD protection (the metalic part is added as an extra); green rails for the 160mm power suppl; RTM rails available only in red
|
|
|
|
|
|
- **ACTION A6:** Parts to keep **cables together** will be added, either off-the-shelf or 3D printed
|
|
|
----> to follow up
|
|
|
|
|
|
- **ACTION A7:** Autodesk model browser to have **descriptive names**, not just part numbers, if possible
|
|
|
----> on going
|
|
|
|
|
|
- **ACTION A8.1:** Creotech waiting for Schroff answer on **painting** options
|
|
|
|
|
|
- **ACTION A8.2:** Creotech waiting for Schroff answer on **6HP RTM front-panel** availability
|
|
|
----> no updates yet
|
|
|
|
|
|
- **ACTION A9:** Creotech to **purchase all the BOM parts** for the first sample crate; Anna would contact Erik
|
|
|
----> starts on Monday
|
|
|
|
|
|
------------------------
|
|
|
|
|
|
- **ACTION B1:** CERN will provide a number on the allowed cable **voltage drop** on 12V cables, 50A
|
|
|
----> ok
|
|
|
|
|
|
- **ACTION B2:** CERN will provide **STEP models** of the front panels of the system and peripheral boards and model of the FMC-nanoFIP
|
|
|
|
|
|
----> ok
|
|
|
- **ACTION B3:** CERN to organise internal review with Christos, Lalit, Matteusz, Kamil, Pieter, Paul, William, Greg, Eva
|
|
|
|
|
|
## Discussion points:
|
... | ... | |