... | @@ -12,10 +12,10 @@ double height boards, the front module and the rear transition module |
... | @@ -12,10 +12,10 @@ double height boards, the front module and the rear transition module |
|
RTM is passive and targeted for
|
|
RTM is passive and targeted for
|
|
connectivity.
|
|
connectivity.
|
|
|
|
|
|
[![](/uploads/9b377f840894f44510ce9c60f7cf968e/pcb-v3-fp-small.jpg)](https://www.ohwr.org/project/conv-ttl-blo/uploads/696f60ab6921ce33f4687587136b097c/pcb-v3-fp.jpg)
|
|
[![](https://ohwr.org/project/conv-ttl-blo/uploads/9b377f840894f44510ce9c60f7cf968e/pcb-v3-fp-small.jpg)](https://ohwr.org/project/conv-ttl-blo/uploads/696f60ab6921ce33f4687587136b097c/pcb-v3-fp.jpg)
|
|
[![](/uploads/29ce7fc535f16752d12d74714e87dfd3/pcb-v3-top-small.jpg)](https://www.ohwr.org/project/conv-ttl-blo/uploads/78c99c690b5d23dbd4661d8c5ef517b8/pcb-v3-top.jpg)
|
|
[![](https://ohwr.org/project/conv-ttl-blo/uploads/29ce7fc535f16752d12d74714e87dfd3/pcb-v3-top-small.jpg)](https://ohwr.org/project/conv-ttl-blo/uploads/78c99c690b5d23dbd4661d8c5ef517b8/pcb-v3-top.jpg)
|
|
[![](/uploads/ff8b1e38911fde7306e08c46937e2b4a/rear-module-small.png)](/uploads/9e890480bae5ea691b522222acc675f5/rear-module.png)
|
|
[![](https://ohwr.org/project/conv-ttl-blo/uploads/ff8b1e38911fde7306e08c46937e2b4a/rear-module-small.png)](https://ohwr.org/project/conv-ttl-blo/uploads/9e890480bae5ea691b522222acc675f5/rear-module.png)
|
|
[![](/uploads/3c0b5f522b81bde8fdc4c863ad0a8da9/rp-small.jpg)](/uploads/8926e72752e33aa6d0978ae6f194c890/rp.jpg)
|
|
[![](https://ohwr.org/project/conv-ttl-blo/uploads/3c0b5f522b81bde8fdc4c863ad0a8da9/rp-small.jpg)](https://ohwr.org/project/conv-ttl-blo/uploads/8926e72752e33aa6d0978ae6f194c890/rp.jpg)
|
|
|
|
|
|
-----
|
|
-----
|
|
|
|
|
... | @@ -24,7 +24,7 @@ connectivity. |
... | @@ -24,7 +24,7 @@ connectivity. |
|
- VME64x double-height form factor using front and rear transition
|
|
- VME64x double-height form factor using front and rear transition
|
|
module (RTM)
|
|
module (RTM)
|
|
- The output pulse is a CERN level standard, [blocking
|
|
- The output pulse is a CERN level standard, [blocking
|
|
standard](https://www.ohwr.org/project/conv-ttl-blo/uploads/8ba57dff4f18540c947830f70e8c8ead/BlockingSpecification.pdf)
|
|
standard](https://ohwr.org/project/conv-ttl-blo/uploads/8ba57dff4f18540c947830f70e8c8ead/BlockingSpecification.pdf)
|
|
- Support for high frequency bursts.
|
|
- Support for high frequency bursts.
|
|
- Selectable pulse width resulting in different repetition
|
|
- Selectable pulse width resulting in different repetition
|
|
frequencies:
|
|
frequencies:
|
... | @@ -109,7 +109,7 @@ Useful user documentation can be found at these locations: |
... | @@ -109,7 +109,7 @@ Useful user documentation can be found at these locations: |
|
|20-09-2011|[Blocking standard](https://www.ohwr.org/project/conv-ttl-blo/wikis/Documents/Standard-Blocking-Output-Signal-Definition) defined.|
|
|
|20-09-2011|[Blocking standard](https://www.ohwr.org/project/conv-ttl-blo/wikis/Documents/Standard-Blocking-Output-Signal-Definition) defined.|
|
|
|24-02-2012|3 prototypes ordered for 30-03-2012.|
|
|
|24-02-2012|3 prototypes ordered for 30-03-2012.|
|
|
|05-04-2012|Prototypes received. Testing HDL simple repetition code.|
|
|
|05-04-2012|Prototypes received. Testing HDL simple repetition code.|
|
|
|21-11-2012|Deployed a Blocking V1 in PS facilities. Source and bitstream available [here](https://www.ohwr.org/project/conv-ttl-blo/uploads/b2aff0ce4516e0dd3a078bdb8a2ae567/basic_trigger.zip)|
|
|
|21-11-2012|Deployed a Blocking V1 in PS facilities. Source and bitstream available [here](https://ohwr.org/project/conv-ttl-blo/uploads/b2aff0ce4516e0dd3a078bdb8a2ae567/basic_trigger.zip)|
|
|
|10-12-2012|Will build 4 V2's before building another 20 and after that 100. Ordered 25 RTM modules.|
|
|
|10-12-2012|Will build 4 V2's before building another 20 and after that 100. Ordered 25 RTM modules.|
|
|
|08-01-2013|Received 4 V2 boards. Some assembly problems on two.|
|
|
|08-01-2013|Received 4 V2 boards. Some assembly problems on two.|
|
|
|18-02-2013|Order placed for 25 [RTM](http://edms.cern.ch/nav/EDA-02452) and 27 [BLO-RTMP](http://edms.cern.ch/nav/EDA-02453) boards.|
|
|
|18-02-2013|Order placed for 25 [RTM](http://edms.cern.ch/nav/EDA-02452) and 27 [BLO-RTMP](http://edms.cern.ch/nav/EDA-02453) boards.|
|
... | | ... | |