Repeat EMC tests performed with EPC once new design is available
Previous EMC tests have been performed with the first version of the RaToPUS together with EPC to a certain extent. If possible such tests should be repeated to mitigate major EMC issues on the RaToPUS side for the upcoming DI/OT EMC testing campaign.