doc: Additions to setup guide

parent e8410742
...@@ -121,12 +121,30 @@ and then focuses on installing the test system (scripts, preparing shortcuts, et ...@@ -121,12 +121,30 @@ and then focuses on installing the test system (scripts, preparing shortcuts, et
To setup the rack for the PTS system, we will need to pass some Lemo 00 cables from the To setup the rack for the PTS system, we will need to pass some Lemo 00 cables from the
front to the back of the 19'' rack. Then, we'll need to connect two RS-485 tester cards front to the back of the 19'' rack. Then, we'll need to connect two RS-485 tester cards
to these cables so that the FM can drive the tester card to perform the tests. to these cables so that the FM can drive the tester card to perform the tests.
The following equipment is needed:
\begin{itemize}
\item hexalobular and crossed screwdrivers
\item 4x 6~ns Lemo 00 cables
\item 4x Lemo 00 T splitters
\item 4x Lemo 00 female-to-female adapters
\item colored cable labels of the following colors:
\begin{itemize}
\item blue
\item green
\item red
\item yellow
\end{itemize}
\item 2x RS-485 tester cards
\item 1x CONV-TTL-RTM-RS485
\end{itemize}
The following steps should be performed: The following steps should be performed:
\begin{enumerate} \begin{enumerate}
\item Open the top and back of the 19'' rack \item Open the top and back of the 19'' rack
\item Take four \textcolor{red}{\textbf{LENGTH}} Lemo 00 cables and pass them from the front \item Take four 6~ns Lemo 00 cables and pass them from the front to the back of the rack
to the back of the rack
\item Fix them to the rack so that they can be inserted in slot 5 of the ELMA crate \item Fix them to the rack so that they can be inserted in slot 5 of the ELMA crate
\item Take four Lemo 00 T splitters and connect one short (1~ns delay) Lemo 00 cable \item Take four Lemo 00 T splitters and connect one short (1~ns delay) Lemo 00 cable
on each female plug of the T splitters on each female plug of the T splitters
...@@ -148,8 +166,8 @@ The following steps should be performed: ...@@ -148,8 +166,8 @@ The following steps should be performed:
\item red cables to RED plugs \item red cables to RED plugs
\item yellow cables to YEL plugs \item yellow cables to YEL plugs
\end{itemize} \end{itemize}
\item Insert a CONV-TTL-RTM-RS485 card into the back of the ELMA crate, in slot 4 \item Insert a CONV-TTL-RTM-RS485 card into the back of the ELMA crate, in slot 5
\item Insert the two RS485 tester cards all the way into the RTM in slot 5: \item Firmly insert the two RS485 tester cards all the way into the RTM in slot 5:
\begin{itemize} \begin{itemize}
\item one tester card for channels 1--3 \item one tester card for channels 1--3
\item the other for channels 4--6 \item the other for channels 4--6
...@@ -161,7 +179,6 @@ The following steps should be performed: ...@@ -161,7 +179,6 @@ The following steps should be performed:
%============================================================================== %==============================================================================
% SEC: Install Ubuntu on the laptop % SEC: Install Ubuntu on the laptop
%============================================================================== %==============================================================================
\pagebreak
\section{Install Ubuntu on the laptop} \section{Install Ubuntu on the laptop}
\label{sec:install-ubuntu} \label{sec:install-ubuntu}
...@@ -216,7 +233,6 @@ the details in the next section to test our system and network was properly inst ...@@ -216,7 +233,6 @@ the details in the next section to test our system and network was properly inst
%============================================================================== %==============================================================================
% SEC: Test environment % SEC: Test environment
%============================================================================== %==============================================================================
\pagebreak
\section{Preparing the laptop test environment} \section{Preparing the laptop test environment}
\label{sec:environment} \label{sec:environment}
......
Markdown is supported
0% or
You are about to add 0 people to the discussion. Proceed with caution.
Finish editing this message first!
Please register or to comment